Veröffentlichungsdatum: 10 April 2014
Projektträger – zwischengeschaltetes Finanzinstitut
London Borough of EnfieldOrt
Beschreibung
Brownfield site redevelopment with social housing to be operated by the London Borough of Enfield.
Ziele
Under the Framework Loan operation "London Green Fund Co-financing Loan", it is proposed to allocate funding to a large sub-project above the EUR 50m equivalent threshold: The Meridian Water redevelopment and regeneration project is located in the London Borough of Enfield, situated in North London. The sub-project comprises Brownfield site redevelopment to provide rental social housing to be owned by the borough. It occupies a strategic location within the London-Stansted-Cambridge Corridor. Situated within the Upper Lee Valley, it is designated as an Opportunity Area within the Mayor of London's strategic plan (the 'London Plan'). The development will bring under-utilised Brownfield land back into productive economic use.
Kommentar(e)
The project is still subject to necessary clearances/approvals.
Sektor(en)
- Stadtentwicklung - Baugewerbe/Bau
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
GBP 39 million (EUR 47 million)
Gesamtkosten (voraussichtlicher Betrag)
GBP 77 million (EUR 95 million)
Umweltaspekte
Compliance with the relevant EU Directives will be verified during appraisal: EU EIA Directive 2011/92/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. The status of any environmental studies and public consultations related to the urban renewal, rehabilitation and reconstruction investments will be reviewed during project appraisal. Energy efficiency requirements in line with the EU Directive on the Energy Performance of Buildings 2010/31/EU will also be further assessed during project appraisal.
Auftragsvergabe
The Bank will require the borrower to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EC and/or 2004/17/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.
Projektstatus
Genehmigt - 4/06/2014
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).