    Referenz: 20140232
    Veröffentlichungsdatum: 29 August 2014

    Projektträger – zwischengeschaltetes Finanzinstitut

    INFRASTRUKTURA E HEKURUDHAVE TE KOSOVES - INFRAKOS SHA

    Ort

    Beschreibung

    The project concerns the rehabilitation of 139 km of single track railway from the northern border with Serbia to the southern border with FYROM.

    Ziele

    This is a strategic transport project, including TEN-T. Furthermore, the project will contribute to the objective of Economic and Social Cohesion.

    Kommentar(e)

    * This designation is without prejudice to positions on status, and is in line with UNSCR 1244/1999 and the ICJ Opinion on the Kosovo declaration of independence. This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Garantie im Rahmen des Außenmandats

    This operation is covered by the ELM Guarantee.

    Under Global Europe NDICI guarantee

    The proposed operation is expected be covered by the comprehensive guarantee granted to the EIB under the Dedicated Investment

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 80 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 245 million

    Umweltaspekte

    If situated in the EU, the project would fall under Annex II of the EIA Directive 2011/92/EU and would therefore be subject to a screening decision to determine whether an EIA procedure is necessary. The environmental procedure applied on the project as well as its potential for negative social impacts are to be further assessed during appraisal.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Projektstatus

    Unterzeichnet - 8/12/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Kosovo* Verkehr