Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20140436
Veröffentlichungsdatum: 15 Mai 2018

Projektträger – zwischengeschaltetes Finanzinstitut

PKP POLSKIE LINIE KOLEJOWE SA

Ort

Beschreibung

The project concerns the modernisation of the Poznan-Szczecin (195 km) section of railway line E59, part of the core Trans-European Transport Network (TEN-T) Baltic-Adriatic corridor.

Ziele

The project, which is a continuation of the line works started several years ago in the southern sections, will upgrade the line to up to 160 km/h for passenger and 100-120 km/h for freight trains, modernise the energy supply and signalling systems. The objective is to increase the quality of rail services in view of encouraging travel by rail and thus enhance sustainable transport in Poland , in line with EU objectives.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 400 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 1080 million

Umweltaspekte

The project has been subject to an Environmental Impact Assessment (EIA). The EIA and the development consents are to be reviewed during appraisal. The project's potential impacts on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC), are to be appraised further.

Auftragsvergabe

The EIB will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 27/03/2019

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Polen Verkehr