Referenz: 20140557
Veröffentlichungsdatum: 12 Februar 2015

Projektträger – zwischengeschaltetes Finanzinstitut

METSÄ FIBRE OY

Ort

Beschreibung

Construction of a new 1.3 million tonnes per annum (tpa) bio-product mill in Äänekoski, Finland.

Ziele

The new bio-product mill will replace the old pulp mill in the same location.

Sektor(en)

  • Industrie - Verarbeitendes Gewerbe/Herstellung von Waren

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 275 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 1225 million

Umweltaspekte

The project falls under the scope of Annex I of Directive 2011/92/EC and is subject to Directive 2010/75/EC. A full environmental impact assessment (EIA) is required. The promoter has prepared a full EIA study and is currently undergoing the permitting procedure with public consultation executed in 2014 (http://www.ymparisto.fi/aanekoskenbiotuotetehdasYVA). The project will be implemented in an existing industrial site far from any site of nature conservation. Full environmental assessment (including application of best available techniques for emission control) will be executed during the project's due diligence.

Auftragsvergabe

The promoter has been assessed by the EIB as being a private company not operating in the utilities sector and not having a status of a contracting entity, thus not being subject to EU rules on public procurement. However, if after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (i.e. Directive 2004/17/EC), then the Bank would require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC and Directive 92/13/EEC), with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 10/06/2015

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).