Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20140610
Veröffentlichungsdatum: 31 August 2016

Projektträger – zwischengeschaltetes Finanzinstitut

PUBLIC ENTITY(IES)

Ort

Beschreibung

The project concerns the new construction, extension, rehabilitation and equipment of 21 technical and technological institutes (TTIs), classified at the post-secondary level of education. It is part of a reform programme aiming to introduce a dual system of vocational and professional training in Ecuador.

Ziele

The project is eligible for EIB co-finance under the external lending mandate in support of the general principles and policy objectives of the European Union. The key objective of the EU Multi-annual Indicative Programme 2014-2017 for co-operation with Ecuador is sustainable and inclusive growth at local level. Improving the supply of skills demanded in local labour markets is a key objective.

Sektor(en)

Garantie im Rahmen des Außenmandats

This operation is covered by the ELM Guarantee.

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 81 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 191 million

Umweltaspekte

A project with similar characteristics within the EU could be classified under Annex II of Directive 2011/92/EU as amended by Directive 2014/52/EU, thus requiring a decision by the competent authority whether or not a formal environmental impact assessment (EIA) process is required. In an EU member state, schools and technological institutes specifically mentioned in the EIA Directive would not normally require an EIA. However, the projects could be covered by Annex II of the Directive in relation to urban development and thus be subject to an EIA. The need for environmental studies and assessment will be reviewed during the appraisal process.

Auftragsvergabe

The promoter is a public authority. The Bank will require the promoter to ensure that any procurement procedures are applied in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

Projektstatus

Unterzeichnet - 28/12/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Ecuador Bildung