Referenz: 20150081
Veröffentlichungsdatum: 8 März 2016

Projektträger – zwischengeschaltetes Finanzinstitut

TRAMWAJE WARSZAWSKIE SP ZOO

Ort

Beschreibung

Construction of new tramway lines in the city of Warsaw and purchase of tramway rolling stock

Ziele

The project consists of tram infrastructure construction and upgrading throughout Warsaw, including construction of 5 new sections of tram lines (total length 20 km), construction of a new tram depot for 150 trams, modernisation of 6 sections of existing tram lines (total length 22 km), acquisition of new tram units rolling stock for operation on the new sections of tramway lines and up to 40 tram units to replace obsolete rolling stock. The new sections of tramway lines will partly replace existing bus services. All of the infrastructure schemes are located in Warsaw. Most schemes are small or of medium size, and there are 4 large schemes (above EUR 50M). A significant part of the project is expected to be funded by the EU (Cohesion Fund).

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

PLN 572 million (EUR 132 million)

Gesamtkosten (voraussichtlicher Betrag)

PLN 1551 million (EUR 358 million)

Umweltaspekte

Construction of new tram lines may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU. Should any scheme have a negative impact on an area forming part of the Natura 2000 network (falling under the Habitats Directive 92/43/EEC or Birds Directive 79/409/EEC), the Bank would require the promoter to act according to the provisions of the aforementioned directives, as transposed into national law.

Auftragsvergabe

The promoter, as a public administration entity, is required to follow EU public procurement rules (2004/17/EC and 2007/18/EC) as implemented by national law, including publication of contract notices in the Official Journal of the EU, if and where appropriate.

Projektstatus

Unterzeichnet - 14/12/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Polen Verkehr