Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20150115
Veröffentlichungsdatum: 18 August 2015

Projektträger – zwischengeschaltetes Finanzinstitut

ORGANISMO PUBLICO PUERTOS DEL ESTADO

Ort

Beschreibung

The project consists of a framework loan to fund rail and road access investments in state-owned ports in Spain through a State Fund - "PAF" (Port Accessibility Fund). The project will help to improve land connectivity in key ports all located in the TEN-T Network. The operation will be a natural continuation of the extensive support provided by the EIB to the development of this seaport network over the last years.

Ziele

The project contributes to strategic transport objectives including TEN-T, Climate Action, Cohesion Priority Regions / Economic and Social Cohesion, Conventional railways, roads and motorways.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 105 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 484 million

Umweltaspekte

As the operation includes several different schemes in several different locations, the need for an Environmental Impact Assessment (EIA) may vary according to location and will be analysed on a case-by-case basis at allocation stage. The same procedure will be followed to assess potential significant impacts on protected nature areas. Compliance with environmental and nature conservation directives and procedures will be checked at the allocation stage. The promoters and final beneficiaries' environmental compliance capabilities will be checked during appraisal.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable ED procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the ED, with publication of tender notices in the ED Official Journal, as and where required.

Projektstatus

Unterzeichnet - 17/12/2015

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Spanien Verkehr