Veröffentlichungsdatum: 18 August 2017
Projektträger – zwischengeschaltetes Finanzinstitut
AGENCE DE REHABILITATION ET DE RENOVATION URBAINEOrt
Beschreibung
The project concerns the rehabilitation of poor urban areas distributed across all 24 regions (Gouvernorats) of Tunisia through the provision of basic public infrastructure. In particular, the project's outputs will consist in the creation or extension of water and wastewater networks, road pavement and drainage, installation of public lighting, construction of playgrounds, sports and socio-cultural centers, and economic and manufacturing facilities. Moreover, the project could include specific interventions in the historical centres of a number of cities (medinas). The project builds upon the success of the predecessor operation "Rehabilitation Urbaine Tunisie" (EIB loan signed in 2012).
Ziele
The project will contribute to local development and job creation through the spill-over effects of the investments in infrastructure and buildings all over the Tunisian territory. The direct and indirect socio-economic benefits will be very large, with strong leveraging of private investments by public infrastructure investments. By strengthening the economic resilience of Tunisian municipalities, the operation will further support the ongoing de-centralisation process in Tunisia.
Sektor(en)
- Stadtentwicklung - Baugewerbe/Bau
Garantie im Rahmen des Außenmandats
This operation is covered by the ELM Guarantee.
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 83 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 250 million
Umweltaspekte
The project is expected to have positive social and environmental effects. Infrastructure works planned (e.g. for roads and drainage, sewage and public utilities) are expected to have very positive impacts on environmental conditions in the areas concerned. In addition, a technical assistance operation financed under the EU-funded Urban Projects Finance Initiative (UPFI) has been put in place to maximise and optimise environmental and social impacts of the project.
Auftragsvergabe
The project is classified as a public sector operation for procurement purposes. The promoter will be required to implement the project in accordance with the Bank's Guide to Procurement for components financed by the Bank.
Projektstatus
Unterzeichnet - 10/07/2018
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).