Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20150333
Veröffentlichungsdatum: 26 Februar 2016

Projektträger – zwischengeschaltetes Finanzinstitut

MINISTRY OF TRANSPORT AND COMMUNICATIONS

Ort

Beschreibung

The Sofia Ring Western Arc Construction project comprises the reconstruction of an existing urban motorway and an important portion of the Sofia Ring Road. The project has a total length of 8.537 km and includes 5 road interchanges, 1 bridge over a river, 1 road overpass, 2 railway overpasses, 3 roundabouts, 2 motorway viaducts (multi-span bridges), retaining walls and reinforced embankments as well as the reconstruction and relocation of several affected utility networks. The project is in line with the Sofia Municipality Development Plan and will connect major motorways, already financed by the EIB: the Lyulin Motorway and the Northern Speed Tangent, ultimately connecting to the Sofia-Kalotnia and Hemus motorways. The project is located on the Trans-European Transport Network (TEN-T), co-financed by the EU Cohesion Fund, and is implemented by the Road Infrastructure Agency.

Ziele

The new motorway will reduce congestion and traffic and improve urban mobility and safety. The project will increase traffic speeds and thus contribute to travel time and operating cost savings.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 9 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 46 million

Umweltaspekte

This project falls under Annex II of the Bulgarian Environmental Act as well as Environmental Impact Assessment (EIA) Directive 2011/92/EU Article 10 e. In line with the Ministry of Environment and Water (MoEW) Decision (No 34-PR/2010) dated 27/09/2010 there is no necessity to carry out an EIA. The nearest Natura 2000 protected sites are located some 7 km away from the proposed development. The competent authority concluded that the project is not likely to exert a negative impact on natural habitats, populations and habitats of species subject to conservation.

Auftragsvergabe

The project has been procured by the Road Infrastructure Agency (RIA) and contracts have been awarded through international open tenders in accordance with Directive 2004/18/EC.

Projektstatus

Genehmigt - 2/05/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Bulgarien Verkehr