Referenz: 20150426
Veröffentlichungsdatum: 24 September 2015

Projektträger – zwischengeschaltetes Finanzinstitut

Ministry of Regional Development and Infrastructure

Ort

Beschreibung

Development of a new highway alignment along the E-60 East-West Highway and, specifically, the 14 km section between Zemo Osiauri and Chumateleti. The project is part of the European route E-60, which is the second-longest European road corridor running from France to Kyrgyzstan. In Georgia, it runs from the Red Bridge at the Azerbaijan Border to the Poti Port at the Black Sea Coast, a distance of about 388 km.

Ziele

The construction of this section of the East-West corridor will contribute to the development of trade, regional integration and interconnectivity, which are important factors for economic growth, progress and social transformation.

Kommentar(e)

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 49 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 176 million

Umweltaspekte

If the project was located in the EU, it would fall under Annex I of Environmental Impact Assessment (EIA) Directive 2011/92/EC. An EIA (and a resettlement action plan) is being done. During appraisal the Bank will review the EIA process to confirm that it complies with applicable domestic legislation, the principles laid out in the EU directives and any other relevant international conventions to which the Republic of Georgia is party, including an assessment of any cross-border impact of the project on the environment (ESPOO Convention).

Auftragsvergabe

The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules. The calls for tender and the award notices will be published in the Official Journal of the EU as appropriate.

Projektstatus

Unterzeichnet - 11/02/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Georgien Verkehr