Veröffentlichungsdatum: 13 August 2015
Projektträger – zwischengeschaltetes Finanzinstitut
LAND BADEN-WUERTTEMBERGOrt
Beschreibung
Investment into rolling stock for Stuttgarter Netz in Baden-Württemberg (network 1). This is a sub-operation under a programme loan for rolling stock and related infrastructure for local and regional public transport in Baden-Württemberg. The project will be carried out by SFBW (Landesanstalt Schienenfahrzeuge Baden-Württemberg).
Ziele
The new rolling stock will improve public transport services in the Stuttgart region (Stuttgarter Netz). More passengers should be attracted to public transport, resulting in improvements in overall mobility whilst reducing the adverse impacts of transport on the environment.
Sektor(en)
- Verkehr - Verkehr und Lagerei
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 250 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 531 million
Umweltaspekte
The manufacture of rolling stock does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 85/337EEC as modified. It is not clear yet if any depots are necessary at this stage. As an associated facility, new depots might be necessary. These could fall under Annex II of the EIA Directive, and therefore may be subject to an EIA procedure. German law requires complying with Directive 92/2011/EC, as amended, to obtain building permits for such elements. If construction of new facilities will be required, then the promoter undertakes to inform the Bank on environmental compliance by submitting a copy of the environmental decision and the non-technical summary of the EIA (if applicable), as well as evidence that the requirements of the EU Habitats Directive 92/43/EC and the EU Birds Directive 79/409/EC have been fulfilled (form A/B or equivalent document to the satisfaction of the Bank) – if applicable.
Auftragsvergabe
The Bank will require the promoter to ensure that contracts for the implementation of the project have been and shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. Network 1 is published under 2014/S 124-220981, d.d. 2.7.2014.
Projektstatus
Unterzeichnet - 6/11/2015
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).