Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20150491
Veröffentlichungsdatum: 7 Dezember 2015

Projektträger – zwischengeschaltetes Finanzinstitut

SENELEC SA

Ort

Beschreibung

This project entails the modernisation of the electricity transport and distribution networks in Senegal.

Ziele

The proposed investment programme concerns the upgrade and modernisation of the electricity transmission and distribution networks in Senegal. In particular this comprises the densification and extension of the electricity network, inter-connection of currently isolated networks, modernisation of crucial distribution equipment and facilities, installation of 300,000 pre-paid meters, 15,000 smart meters for large electricity consumers, and the establishment of a modern customer-relationship-management system. Part of the funds provided by the EIB will be dedicated to rural electrification and to the development of the transmission and distribution network in the southern part of Senegal.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 88 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 159 million

Umweltaspekte

If located in the EU, the project would fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, requiring the competent authority to determine the need for a full EIA. The status of the EIA process for all components that could require an EIA will be checked at appraisal. The impact that can be typically expected from the proposed activities relates to visual impact, vegetation clearance, impact on flying vertebrates, electromagnetic fields, noise nuisance, disturbance during construction, and possibly land acquisition and resettlement. The environmental and social aspects of the project will be assessed in detail during the appraisal.

Auftragsvergabe

The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

Projektstatus

Unterzeichnet - 28/11/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Senegal Energie