Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20150683
Veröffentlichungsdatum: 16 Februar 2016

Projektträger – zwischengeschaltetes Finanzinstitut

GLAS CYMRU CYFYNGEDIG

Ort

Beschreibung

The programme forms part of Welsh Water's capital expenditure programme for the regulatory period 2015-20 (AMP6). The individual schemes are located throughout the entire service area. The programme is mainly driven by EU directives as applicable to the water and wastewater sector as well as resource efficiency and adaptation of the systems and infrastructures to climate change and demographic growth.

Ziele

The project comprises improvements to water supply and wastewater collection and treatment as part of the promoter's regulatory investment programme AMP 6 (Asset Management Plan 6). The AMP 6 Programme was approved by the economic regulator OFWAT in 2014 in order to support compliance with EU directives and stricter standards.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 324 million (GBP 250 million)

Gesamtkosten (voraussichtlicher Betrag)

EUR 777 million (GBP 600 million)

Umweltaspekte

The programme includes improvements to water supply and wastewater collection and treatment as part of the promoter's regulatory investment programme AMP6 to support maintenance and improvement of compliance with the Water Framework Directive (2000/60/EC) and the Urban Waste Water Treatment Directive (91/271/EEC). Compliance with the EU and national environmental legislation and procedures will be examined during appraisal.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC , or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 20/01/2017

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Vereinigtes Königreich Wasser, Abwasser