Veröffentlichungsdatum: 5 April 2016
Projektträger – zwischengeschaltetes Finanzinstitut
DUNEA NVOrt
Beschreibung
The project is part of a 5-year (2016-2020) investment programme related to the upgrading of drinking water supply and distribution networks in The Hague region. The programme consists mainly of renewal and upgrading of raw water conveyors, potable water distribution networks, pumping stations, water meters, and operational support infrastructure.
Ziele
The project will secure or enhance the quality of life of up to 1.3 million inhabitants situated in The Hague region in the Netherlands by improving the quality and reliability of drinking water supply and by improving resource efficiency. The project allows for continued compliance with the Water Framework Directive (2000/60/EC) and the Drinking Water Directive (98/83/EC) and national norms. The project is therefore eligible for EIB finance under Article 309 point (c) common interest.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 100 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 210 million
Umweltaspekte
The investment is geared toward securing a sustainable management of water supply and distribution, bringing about positive social and environmental benefits. The upgrade of pumping stations and other network and process optimisation measures are examples of components with an impact on the environment and resource efficiency. Compliance with EU and national environmental legislation will be verified during appraisal.
Auftragsvergabe
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Projektstatus
Unterzeichnet - 12/07/2016
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).