Veröffentlichungsdatum: 30 September 2016
Projektträger – zwischengeschaltetes Finanzinstitut
MINISTERE DE L'EQUIPEMENT,DE L'AMENAGEMENT DU TERRITOIREOrt
Beschreibung
Construction of a 2x2 lane viaduct of about 2070 m and its connections to the urban network of the city of Bizerte
Ziele
The project rationale is to reduce traffic congestion in the city centre of Bizerte, Tunisia's third-largest city.
Kommentar(e)
This operation is covered by the EU Guarantee for EIB loans outside the EU.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 123 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 247 million
Umweltaspekte
If the project was located within the EU, it would fall under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and would require full EIA and public consultation. Two full EIA procedures with public consultations for the different components of the project have been done according to Tunisian national legislation. The Bank shall investigate environmental and social (E&S) aspects and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices.
Auftragsvergabe
The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.
Projektstatus
Unterzeichnet - 3/01/2017
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).