Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20160053
Veröffentlichungsdatum: 30 Mai 2016

Projektträger – zwischengeschaltetes Finanzinstitut

DOLOMITI ENERGIA HOLDING SPA

Ort

Beschreibung

Investments in the modernisation, upgrade and development of the electricity and gas distribution networks, as well as small hydropower facilities in the autonomous province of Trento over the period 2017-2020

Ziele

The overall purpose of the programme is to modernise the electricity and gas networks, as well as small hydropower facilities, in order to secure the electricity supply, the quality of the service and to cater for new system user.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 100 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 180 million

Umweltaspekte

The project will concern the implementation of electricity distribution schemes, some of which may require the competent national authority to determine the need for an environmental impact assessment (EIA). For electricity distribution, the main impact that can be typically expected for the programme relates to noise nuisance and disturbance during construction, vegetation clearance, visual impact, and electromagnetic fields, as well as on flying vertebrates. For gas projects and hydropower projects, the environmental impact is expected to be low.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Projektstatus

Unterzeichnet - 22/10/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Italien Energie