Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20160569
Veröffentlichungsdatum: 4 Juli 2016

Projektträger – zwischengeschaltetes Finanzinstitut

EUROPEAN SPALLATION SOURCE ERIC

Ort

Beschreibung

Construction and operation of a multi-disciplinary research laboratory in Lund, Sweden, based on the world's most powerful neutron source

Ziele

The European Spallation Source (ESS) will create a pan-European research infrastructure that will serve a community of 5 000 researchers across numerous research areas such as new materials (nanomaterials), energy and climate (fuel cells, batteries, biofuels, solar energy and superconductors), health (tissues, proteins, enzymes and other complex biological materials), engineering (catalysers, aeroplane wings, automobile engines), chemistry (environmentally friendly detergents, paints, cleaners and lubricants), or environmental technology (improved knowledge of water treatment and cleaner industrial processes). The ESS is one of the strategic research infrastructure projects under the "Excellent Science" programme of Europe's Horizon 2020 strategy.

Sektor(en)

  • Dienstleistungen - Erbringung von Freiberuflichen, Wissenschaftlichen und Technischen Dienstleistungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 200 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 1843 million

Umweltaspekte

The facility will require permits in line with the Swedish Radiation Protection Act, the Swedish Environmental Code and the Swedish Planning & Building Act. Radiation protection and safety will be carefully monitored by the regulatory authorities. The status of the authorisations will be assessed during appraisal of the project. Research infrastructure is not specifically mentioned in Directive 2011/92/EU on environmental impact assessment (EIA), though due to its size, the project could be covered by Annex II of the directive in relation to urban development. The Bank's services will verify during appraisal whether an EIA is required for any component of the project.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir. 2004/18/EC and Dir. 2007/66/EC), with publication of tender notices in the Official Journal of the EU, as and where required. Procurement issues will be reviewed during appraisal.

Projektstatus

Unterzeichnet - 29/11/2016

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Dänemark Schweden Dienstleistungen