Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20160956
Veröffentlichungsdatum: 16 März 2017

Projektträger – zwischengeschaltetes Finanzinstitut

PUBLIC ENTITY(IES)

Ort

Beschreibung

The framework programme is composed of two major components a) construction and refurbishment of a substantial number of student dormitories across the major university campuses in Hungary and b) major expansion and upgrading of two university campuses: one in Budapest and another in Pécs.

Ziele

The project aims to enhance access to higher education by providing modern and affordable student accommodation. It will also contribute to national human capital formation and innovation capacity by expanding and refurbishing two major university campuses.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 92 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 191 million

Umweltaspekte

Universities and research institutions are not specifically mentioned in the Environmental Impact Assessment (EIA) Directive (2011/92/EU), as amended. An EIA is therefore not required by the directive. However, parts of the investments might be covered by Annex II of the directive in relation to urban development. The Bank's services will verify during appraisal whether an EIA is required for any component of the project. Potential impact on Natura 2000 conservation sites as well as operating procedures and systems related to animal testing, genetically modified organisms (GMOs), biosafety hazards and wastes management will also be checked. For new buildings the following EU directives on energy performance of buildings are applicable: (a) Directive 2010/31/EU on the energy performance of buildings and (b) Directive 2012/27/EU on energy efficiency. The design of the buildings with regard to energy performance and any specific targets to be met will be verified during appraisal.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for the implementation of the project have been and shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Projektstatus

Unterzeichnet - 1/03/2018

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Ungarn Bildung