Referenz: 20170089
Veröffentlichungsdatum: 31 August 2018

Projektträger – zwischengeschaltetes Finanzinstitut

PUBLIC ENTITY(IES)

Ort

Beschreibung

The project concerns the capacity increase and treatment level upgrade of the Alexandria West Wastewater Treatment Plant (WWTP).

Ziele

The objectives of the operation are: (i) environmental protection and depollution, (ii) improving public health, and (iii) promoting sustainable economic development. First, the primary objective of the operation is to bring environmental benefits to the project area through the sustainable disposal or utilisation of effluent and sludge, sustainable water resources management, and the depollution of Lake Maryut and the Mediterranean Sea. Second, the project will improve the public health situation in Alexandria by improving water quality and reducing pollution. Third, the project is expected to lead to positive economic externalities by, for example, improving the economic situation for fisheries and tourism in the area.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Garantie im Rahmen des Außenmandats

This operation is covered by the ELM Guarantee.

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 140 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 185 million

Umweltaspekte

The project is anticipated to contribute towards efficient and sustainable water resources management in Egypt as well as to the Egyptian climate protection efforts. In addition, it is expected to have substantial environmental and social benefits, as it will reduce the levels of pollution in Lake Maryout, El Mex Bay and the Mediterranean Sea. Any potential adverse environmental and social impacts are site-specific and can be prevented and/or readily minimised through appropriate mitigation measures and by adhering to globally recognized performance standards, guidelines, and/or design criteria, including EIB environmental and social principles, standards and practices.

Auftragsvergabe

The EIB will require the promoter to ensure that the implementation of the project will be done in accordance with EIB's Guide to Procurement.

Projektstatus

Unterzeichnet - 31/12/2019

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Ägypten Wasser, Abwasser