Referenz: 20170090
Veröffentlichungsdatum: 4 August 2017

Projektträger – zwischengeschaltetes Finanzinstitut

HOLDING COMPANY FOR WATER AND WASTEWATER

Ort

Beschreibung

The project concerns the depollution of Kitchener drain in the Delta region in Egypt.

Ziele

The project aims at the depollution of the Kitchener Drain through investments in: (i) wastewater & sanitation; (ii) solid waste, and (iii) drain infrastructure rehabilitation. The Kitchener Drain is one of the most severely polluted drains in the Egyptian Nile Delta. The project is expected to significantly improve health and social conditions in the surrounding areas.

Kommentar(e)

The project is expected to be co-financed by EIB and EBRD whereby EIB financing would focus on the wastewater & sanitation project components and EBRD financing would focus on the solid waste and drain rehabilitation project components. The EIB and EBRD will be a seeking a EU grant contribution from the Neighbourhood Investment Facility for this project.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Garantie im Rahmen des Außenmandats

This operation is covered by the EU Guarantee for EIB loans outside the EU.

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 233 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 441 million

Umweltaspekte

The project is expected to have substantial environmental and social benefits as it addresses the deteriorated condition of water in the highly polluted Kitchener Drain. Any potential adverse environmental and social impacts are site-specific and can be prevented and/or readily minimised through appropriate mitigation measures and by adhering to globally recognized performance standards, guidelines, and/or design criteria, including EIB environmental and social principles, standards and practices.

Auftragsvergabe

The Bank will require the promoter to ensure that implementation of the project components financed by the Bank will be done in accordance with the Bank's Guide to Procurement.

Projektstatus

Unterzeichnet - 18/12/2018

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Ägypten Wasser, Abwasser