Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20170287
Veröffentlichungsdatum: 6 Juli 2018

Projektträger – zwischengeschaltetes Finanzinstitut

MINISTRY OF REGIONAL DEVELOPMENT AND INFRASTRUCTURE

Ort

Beschreibung

The project consists of the construction of approximately 13 km of a dual two-lane carriageway in Georgia on a new E60 alignment between Ubisa and Shorapani - the F3 Section between Khevi to Argeveti.

Ziele

The proposed project will support the Georgian Government in implementing its 2017-2020 upgrade/construction programme of priority roads throughout the country. The objective is to promote sustainable road infrastructure development providing efficient transportation, enhancing cross border/regional connectivity and ensuring short and long-term benefits for all users.

Sektor(en)

Garantie im Rahmen des Außenmandats

This operation is covered by the ELM Guarantee.

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 332 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 352 million

Umweltaspekte

If located in the EU, the project would be subject to the EU Environmental Impact Assessment (EIA) Directive (2014/52/EU amending EIA Directive 2011/92/EU) and the Birds and Habitats Directives (2009/147/EC and 92/43/EEC respectively). A final draft EIA was completed (pending approval from the Competent Authority) and submitted to the Bank in April 2018 and is being assessed in the context of the appraisal. There are no natural 2,000 habitats. No protected areas will be impacted. The nearest protected area in the region is the Borjomi Nature Reserve which is located more than 15 kilometers south of the project road. The nearest Important Bird Area (IBA) to the project road is the Adjara-Imereti Ridge more than 20 kilometers south of the project road, which overlaps, with the Borjomi Nature Reserve.

Auftragsvergabe

The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement, the relevant applicable EU public procurement rules and relevant applicable local legislation. Publication of tender notices will take place in the Official Journal of the European Union, as required.

Projektstatus

Genehmigt - 3/09/2018

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Georgien Verkehr