Referenz: 20170912
Veröffentlichungsdatum: 23 September 2019

Projektträger – zwischengeschaltetes Finanzinstitut

SOCIETE DE PATRIMOINE DES EAUX DU NIGER

Ort

Beschreibung

The project will finance the construction of a new drinking water treatment plant of Karey Gorou with a production capacity of 100 000 m3/day and related infrastructure (reservoirs, pipelines, pumping stations, connections) to adapt the existing water distribution system.

Ziele

The project will increase the water production capacity for the city of Niamey, to cope with the water demand until 2030, by enabling the delivery of the new volumes to a beneficiary population of about 2 million and will support the expansion of the city through over 25 000 new household connections. As a result, it will also improve the living conditions of the local population and thus contribute to reduce migration as an adaptation strategy of the population caused by water scarcity in the Sahel region, bringing a positive impact on public health and social stability.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 105 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 220 million

Umweltaspekte

Inside the EU, the project components would be categorised under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU amended by 2014/52/EU and therefore would be subject to environmental screening to define if an EIA would be required according to the relevant competent authority. An EIA will be required for the project. The Bank will assess the environmental and social aspects of the project during appraisal to ensure adherence to its social standards. Climate change aspects will be further examined during appraisal.

Auftragsvergabe

The promoter will have to ensure that implementation of the project in line with EIB's Guide to Procurement.

Projektstatus

Unterzeichnet - 18/12/2019

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Niger Wasser, Abwasser