Veröffentlichungsdatum: 13 August 2018
Projektträger – zwischengeschaltetes Finanzinstitut
PUBLIC ENTITY(IES)Ort
Beschreibung
The project concerns the financing of the construction of two motorway sections (Lot 3.1, Lot 3.3) and a dual-tube, two-lane tunnel (the Zheleznitsa Tunnel) on the Struma Motorway in Bulgaria. The complexity of the construction works required the split into lots and the separation of Lot 3.2 (from Krupnik to Kresna, including the Kresna Gorge) into a separate project. The route of Struma Motorway is part of the core road Trans-European Transport Network (TEN-T) on the territory of the Republic of Bulgaria and, after its construction, the motorway shall contribute to achieving the objectives related to the core road TEN-T. Struma Motorway is divided to 5 lots with Lots 0, 1, 2, and 4 already completed and operational.
Ziele
The project will contribute to the development of a strategic part of the core road TEN-T on the territory of Republic of Bulgaria.
Sektor(en)
- Verkehr - Verkehr und Lagerei
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 57 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 412 million
Umweltaspekte
It is a requirement that all sub-projects must be implemented in compliance with EU environmental legislation and the promoter has identified those sub-projects for which it considers an environmental impact assessment (EIA) is required. Should any sub-project have a negative impact on an area forming part of the Natura 2000 network (falling under the Habitats Directive 92/43/EEC or Birds Directive 2009/147/EC), the Bank would require the promoter to act according to the provisions of the aforementioned directives as transposed into national law. These matters will be clarified during the appraisal.
Auftragsvergabe
The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/25/EU and related Directive 92/13/EU) as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.
Projektstatus
Genehmigt - 28/09/2018
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).