Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20180326
Veröffentlichungsdatum: 27 Mai 2019

Projektträger – zwischengeschaltetes Finanzinstitut

MERIDIAM SAS

Ort

Beschreibung

The project consists of a quasi-equity investment of Allego BV, an electrical vehicle (EV) charging solution provider with Pan-European ambitions.

Ziele

The EIB financing will allow Allego to foster its growth and market penetration thus creating new jobs, accelerating its investment plan and contributing to economic growth. This operation is part of the EGFF, a product designed to address a (quasi) equity gap linked to structural market failures across the EU in the provision of risk capital to late-stage venture-backed companies.

Kommentar(e)

Allego addresses the urgent need in Europe for a sufficiently dense, harmonised charging infrastructure by providing a full range of charging solutions including installation, operation and maintenance services.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 40 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 99 million

Umweltaspekte

The project charging network components consist of short connections to the distribution grid networks and the respective charging stations. They are expected to have limited environmental impact, which will typically be related to noise nuisance and disturbance during construction. After completion, no environmental impact is expected from the ordinary operation of the stations. No environmental impact assessment is required for the project, as it does not fall under either Annex I or Annex II of the EU Environmental Impact Assessment (EIA) Directive. EV infrastructure in itself is not subject to environmental impact assessment processes under either Annex I or Annex II of the EIA Directive. However, the building of green field parking locations where the EV infrastructure is installed and/or connections to the grid may be screened in under Annex II. The Bank will require in those cases to be informed of the screening decision from Competent Authority. The project is expected to have a positive effect on the environment. The project will power electric vehicles with no emissions of pollutants and hence will contribute to meet air quality standards as set out by the EU and the World Health Organization. The project will also contribute to reduce road transport noise pollution as EVs are also much quieter than conventional vehicles. Finally, the project will have a significant impact on CO2 emissions reduction that will result from the replacement of conventional cars operating on fossil fuels with electric cars powered by less carbon intensive electricity. No major social issues are envisaged.

Auftragsvergabe

The promoter has been assessed by the EIB as being a private company and hence not being subject to EU rules on public procurement or concessions.

Projektstatus

Unterzeichnet - 12/12/2018

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Niederlande Verkehr