Referenz: 20180659
Veröffentlichungsdatum: 1 Juli 2020

Projektträger – zwischengeschaltetes Finanzinstitut

ENCAVIS AG,SOLAR CENTURY HOLDINGS LTD

Ort

Beschreibung

The project concerns the construction and operation of two solar photovoltaic plants with a total combined capacity of 482MWp located in the municipalities of Talayuela (Extremadura) and Alcalá de Guadaira (Sevilla) in Spain.

Ziele

The aim is to support renewable energy and energy efficiency as well as climate action targets. Furthermore, as the project is located in EIB cohesion priority Regions, it will also foster economic and social cohesion.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 120 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 401 million

Umweltaspekte

Regarding the environmental aspects, the Talayuela plant is included in the Annex I of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU, because of the presence of a 21 km 400 kV transmission line; and the Cabrera plant is included in the Annex II, being screened in by the competent authority. Therefore, both projects require EIA processes to be performed. The projects have already submitted their EIA. Talayuela has a single EIA for both the plant and the transmission system, and has already secured its environmental permit. Cabrera is divided in 4 plots and a transmission system, each of them with its own EIA, and is in the process of securing the environmental permits. Most of the required lands for the PV plant and the transmission line (838 Ha for the biggest plant, 460 Ha for the smaller) have been leased, but for the missing agreements, expropriation may be needed. Adequate assessment of environmental and social aspects, including compliance with relevant EU directives, and specifically Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively), will be performed at appraisal.

Auftragsvergabe

The promoter has to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation, as appropriate: Directive 2014/23/EU / 2014/24/EU or 2004/18/EC / 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 4/11/2019

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Spanien Energie