Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20190040
Veröffentlichungsdatum: 27 Juni 2019

Projektträger – zwischengeschaltetes Finanzinstitut

BANCO DE DESENVOLVIMENTO DE MINAS GERAIS SA

Ort

Beschreibung

The project consists of a Framework Loan to part-finance a series of climate action projects in the state of Minas Gerais, Brazil, including solar photovoltaic (PV), small-scale hydropower and other renewables.

Ziele

The main purpose of the operation is to part-finance climate action initiatives that will contribute to the achievement of climate change mitigation, which is one of the high-level horizontal objectives of the External Lending Mandate (ELM) for all regions and endorsed by the Management Committee. The proposed operation is therefore fully compliant with the EIB's ELM as it supports the development of sustainable energy in the region, providing environmental benefits and securing the energy supply. It will also contribute to the development of economic infrastructure and of the private sector.

Sektor(en)

Garantie im Rahmen des Außenmandats

This operation is covered by the ELM Guarantee.

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 148 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 197 million

Umweltaspekte

The operation intends to generate environmental benefits by supporting renewable energy (i.e. small size solar photovoltaic, small-scale hydropower, eventually bioenergy plants – biomass) and energy efficiency schemes that help to mitigate climate change.

Auftragsvergabe

It is expected that the beneficiaries of the schemes under this Framework Loan will be predominantly private entities not operating in the utility sector, not having a status of contracting entity and not being concessionaire. However, it cannot be excluded that some schemes could be classified as public for procurement purposes. Schemes that are subject to local content requirements will not be eligible for the EIB's financing. In any case, the Financial Intermediary will be required to take all the requisite measures to ensure that the procurement procedures are carried out in accordance with the Bank's Guide to Procurement.

Projektstatus

Unterzeichnet - 21/10/2019

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Brasilien Energie