Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20190047
Veröffentlichungsdatum: 9 März 2020

Projektträger – zwischengeschaltetes Finanzinstitut

MINISTRY OF INFRASTRUCTURE / GDDKIA - REPUBLIC OF POLAND

Ort

Beschreibung

The project will finance the construction of a section (about 41 km-long) of the S6 expressway between Bozepole and the "Tri-City" (metropolitan area consisting of Gdynia, Sopot and Gdansk) bypass. The project is located on a comprehensive Trans-European Transport Network (TEN-T) in a less developed region and will improve road traffic conditions in the corridor.

Ziele

The investment is essential for improving the efficiency of the road connection to the Gdynia and Gdansk ports from the north-west regions of Poland. It forms part of the broader S6 route development, connecting Szczecin and Gdansk along the Baltic coastline of Poland with an expressway standard road. The expected economic benefits include time savings and vehicle operating cost reductions for road users due to enhanced road infrastructure capacity. The project may also offer some modest safety and environmental benefits to be assessed.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 150 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 487 million

Umweltaspekte

The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending the EIA Directive 2011/92/EU, requiring a full EIA procedure. EIA studies have been completed and the Competent Authorities have issued Environmental Decisions.

Auftragsvergabe

The promoter has to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/24/EU or 2004/18/EC, where applicable), as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 1/10/2020

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Polen Verkehr