Veröffentlichungsdatum: 12 Juli 2019
Projektträger – zwischengeschaltetes Finanzinstitut
RENOVABLES DE LA RIBERA SLOrt
Beschreibung
The project consists of the financing of a 111-megawatt (MW) wind farm and its associated infrastructure, located in the Spanish region of Navarra.
Ziele
The present operation will contribute to the achievement of Spanish 2020 targets for renewable energy and to the reduction of the Carbon dioxide (CO2) emissions.
Sektor(en)
- Energie - Energieversorgung
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 50 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 104 million
Umweltaspekte
The plant and its ancillary infrastructure (including the 220 kilovolts (kV) transmission line of approximately 13.4 km) are included in the Annex II of the Environmental Impact Assessment (EIA) Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU). An EIA was performed for the plant and another EIA was performed for the grid connection. The project, including the transmission line, has obtained its environmental permit in February 2017 (Declaracion de Impacto Ambiental). The project has leased all the land for the plant and obtained part of the rights of way for the transmission line. The remaining rights of way for the transmission line will be obtained either by negotiating with individual landowners or through the application of the expropriation procedure (the transmission line having received a Declaration of Public Utility from the relevant authority in February 2019). Adequate assessment of environmental and social aspects, including compliance with relevant EU directives, specifically Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively), will be performed at the appraisal.
Auftragsvergabe
The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.
Projektstatus
Unterzeichnet - 4/11/2019
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).