Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20190278
Veröffentlichungsdatum: 1 Februar 2022

Projektträger – zwischengeschaltetes Finanzinstitut

FIRA 2000 SA

Ort

Beschreibung

The project comprises the extension of a trade fair site aiming to reach high energy efficiency standards.

Ziele

The project will offer more exhibition space in modern energy-efficient facilities. It will help the Promoter achieve a step change in terms of a greater number of international events and number of visitors that will strengthen its competitive position and further contribute to the economic and social impact that Fira de Barcelona has on the Barcelona Metropolitan area.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 175 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 355 million

Umweltaspekte

Compliance with the relevant EU Directives will be verified during appraisal: EU EIA Directive 2011/92/EU amended by 2014/52/EU, EU SEA Directive 2001/42/EC, EU Habitats Directive 92/43/EEC and EU Birds Directive 2009/147/EC. The status of any environmental studies and public consultations related to the construction and refurbishment investments as well as the alignment of energy efficiency requirements with the EU Directive on the Energy Performance of Buildings 2010/31/EU will be futher assessed during project appraisal.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, Directives 2014/23/EU and 2014/24/EU, where applicable, as well as Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Projektstatus

Unterzeichnet - 30/05/2022

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Spanien Stadtentwicklung