Veröffentlichungsdatum: 2 Januar 2023
Projektträger – zwischengeschaltetes Finanzinstitut
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE - SAOrt
Beschreibung
The project concerns the construction of a new 51.8 km 2x2 lanes motorway section of the A3 motorway between the towns of Targu Mures, Ogra and Campia Turzii and a 4.7 km national 2x2 link road to the city of Targu Mures.
Additionality and Impact
The Project is located on the Core TEN-T Network in a Cohesion region of Romania. The Project addresses the market/network failures related to accessibility along the Core TEN-T Network.
The new link will reduce travel times, vehicle operating costs, accident levels and exposure of inhabitants to air and noise pollutants and improve the quality of life for local residents along the existing DN15 (E60).
The Project will serve local, regional and international traffic demand. The project has benefited from JASPERS and PASU Technical Assistance to the Managing Authority.
Romania will benefit from the advantageous financial conditions offered by EIB, including long tenors (up to 25 years) and attractive interest rates. Such conditions will allow Romania for a considerable financial flexibility in the implementation of its transport infrastructural investments (including the T Mures-Ogra-C Turzii A3 highway) and contribute to the effective absorption of EU funds.
Ziele
The aim is to improve mobility on the trans-European network (TEN-T) core road infrastructure, reduce travel times, vehicle operating costs and accident levels. The project will also improve the quality of life for local residents along the existing DN15 (E60), by reducing their exposure to air and noise pollutants.
Sektor(en)
- Verkehr - Verkehr und Lagerei
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 33 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 529 million
Umweltaspekte
The EU and Romania national legal procedures have been properly followed in the project preparation and implementation. EIA study has been completed and the competent authorities have issued environmental decisions and building permits.
Auftragsvergabe
The Promoter is a public contracting authority subject to the relevant EU directives. The procurement is following the principles of the Directives 2014/24/EC and 89/665/EC. The project works and service contracts have been procured through open tenders after international publication in the OJEU.
Projektstatus
Genehmigt - 8/12/2022
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).