Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20190780
Veröffentlichungsdatum: 20 Mai 2021

Projektträger – zwischengeschaltetes Finanzinstitut

HENAN PROVINCE

Ort

Beschreibung

The project will finance the afforestation of degraded lands and improve the health and resilience of forest ecosystems through sustainable forest management in the Yellow River Basin of Henan Province. The project covers an area of about 95,000 ha and the implementation period is 2022-2026.

Ziele

The project (under appraisal) is driven by the need for environmental protection and enhancement of the Yellow River Basin and areas with high risks for desertification and soil erosion in Henan Province. It aims to support climate change mitigation and improve the resilience of forest ecosystems to changing weather conditions (climate adaptation). The project is expected to contribute 100% to Climate Action and Environment Sustainability transversal objectives under the EIB Climate Bank Roadmap. Tackling climate change is a key priority for both the EU and China. The project would be fully in line with the 2016 EU Strategy on China, the EU-China 2020 Strategic Agenda for Cooperation, the 2019 EU-China: A Strategic Outlook and the 2015/2018/2019 EU-China Joint Statements, which call for strengthening EU-China dialogue/cooperation in the area of climate change, sustainable development, environment protection and biodiversity. It is expected to be in line with the EU Biodiversity Strategy and EU Strategy on Adaptation to Climate Change (2021). The project would also contribute to the UN Sustainable Development Goals (SDG), particularly SDGs 13 and 15.

Kommentar(e)

The project is known in China as "EIB Forest Resource Development and Ecological Service Project in Henan Province."

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 150 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 301 million

Umweltaspekte

The project will have to comply with the EIB's environmental and social (E&S) requirements. The E&S aspects and permitting situation as well as the demands and requirements of the competent local environmental authorities will be part of the Bank's usual project due diligence.

Auftragsvergabe

The Promoter has to ensure that the project is implemented in accordance with the EIB's Guide to Procurement.

Projektstatus

In Prüfung - 5/05/2021

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

China Landwirtschaft, Fischerei, Forstwirtschaft