Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20190810
Veröffentlichungsdatum: 20 Oktober 2022

Projektträger – zwischengeschaltetes Finanzinstitut

MINISTERE DE L'EQUIPEMENT,DE L'AMENAGEMENT DU TERRITOIRE

Ort

Beschreibung

The project aims at upgrading the RN13 road section between Sfax and Kasserine (180 km) from 2x1 to 2x2 lanes, including median barriers. This road is leading to the Algerian border, about 50 km further east.

Ziele

The project is in line with the general policy of the country and has been selected as a national priority of the National Transport Master Plan 2040 and was considered for the Action Plan for the Period 2020 to 2030.

Kommentar(e)

The signature is expected to occur in the first half of 2023.

Sektor(en)

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 210 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 424 million

Umweltaspekte

The Bank shall investigate environmental and social aspects during appraisal and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices. The Bank shall also verify the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures. Public consultation at feasibility studies and preliminary design stages were carried out for most of the project scope. They are being updated for the final technical description and will be reviewed. Stakeholder engagement arrangements and particularly grievance mechanism for project implementation will also be assessed.  The preliminary Climate Risk Assessment shows risks of flooding in various project sections, notably in the vicinity of main cities and rivers. The preliminary design considers 50 to 100-year return periods for drainage systems depending on risk and size. Detailed design will assess if more climate adaptation measures are required.

Auftragsvergabe

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Projektstatus

Unterzeichnet - 13/06/2024

Milestone
In Prüfung
Genehmigt
Unterzeichnet
8 Dezember 2022
13 Juni 2024

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Tunesien Verkehr