Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20200001
    Veröffentlichungsdatum: 16 Januar 2023

    Projektträger – zwischengeschaltetes Finanzinstitut

    ZELJEZNICKA INFRASTRUKTURA CRNE GORE AD

    Ort

    Beschreibung

    The project concerns the railway reconstruction along the Vrbnica - Podgorica - Bar railway line forming a part of the Orient/East Mediterranean TEN-T Core Network corridor, indicative extension to the Western Balkans.

    Ziele

    The project concerns rehabilitation works across southern, central and northern Montenegro along the Bar - Podgorica - Vrbnica railway line forming part of the indicative Extended Orient/East Mediterranean TEN-T core corridor (SEETO Route 4). The project is expected to include the following four components to be confirmed during appraisal: - Rehabilitation of the permanent way on 20 km of single track line in central Montenegro; - Rehabilitation of 13 steel bridges at various locations across the country; - Rehabilitation of 8 tunnels at various locations across the country; - Modernization of 3 workshops for rolling stock in Bar, Podgorica and Niksic;

    Sektor(en)

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 76 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 80 million

    Umweltaspekte

    If situated within the EU, all the project components would fall under Annex II of Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended by Directive 2014/52/EU, and would therefore be subject to screening. Screening out decisions for the tunnels and bridges have already been issued by the Competent Authority, and similar decisions are expected for the remaining two components. The overall compliance of the project to EIB standards, and the safeguard management arrangements, will be verified during appraisal.

    Auftragsvergabe

    The EIB will require the promoter to ensure that any procurement procedures are done in accordance with the EIB's Guide to Procurement and the relevant applicable EU public procurement rules.

    Projektstatus

    Unterzeichnet - 27/05/2024

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    21 Dezember 2022
    27 Mai 2024

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Montenegro Verkehr