Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20200459
Veröffentlichungsdatum: 8 Dezember 2020

Projektträger – zwischengeschaltetes Finanzinstitut

UNIVERSITATEA TEHNICA DIN CLUJ-NAPOCA

Ort

Beschreibung

Financing investments of Technical University of Cluj-Napoca.

Ziele

The project is part of a longer term modernisation programme of the University and in line with EU public policy goals associated with Education and Training 2020, Horizon 2020, and the Urban Agenda for the EU. The project contributes to the European Higher Education Area and the European Research Area by enhancing teaching and learning environments and improving research facilities. The proposed operation provides additional financial resources for the expansion and improvement of both the teaching and research activities and therefore, responds to various needs of the innovation system in Romania, most notably the supply of highly skilled graduates in areas of key economic and social importance and the provision of infrastructure for public research.

Sektor(en)

  • Dienstleistungen - Erbringung von Freiberuflichen, Wissenschaftlichen und Technischen Dienstleistungen
  • Bildung - Erziehung und Unterricht

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 21 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 65 million

Umweltaspekte

The Directive 2011/92/EU amended by 2014/52/EU does not specifically mention the need for an environmental impact assessment (EIA) for buildings relating to education, but it may be that some sub-projects can be regarded as urban renewal projects (Annex II of the European Directive). This will be studied in detail during the appraisal. The possible impact on natural sites will be checked during the appraisal.

Auftragsvergabe

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU as well as Directive 89/665/EEC) as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

Projektstatus

Unterzeichnet - 27/11/2020

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Rumänien Dienstleistungen Bildung