Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20200725
Veröffentlichungsdatum: 28 Oktober 2022

Projektträger – zwischengeschaltetes Finanzinstitut

MTN NIGERIA COMMUNICATIONS PLC

Ort

Beschreibung

The EIB will finance the upgrade of the promoter's 4G core mobile broadband network, as well as expand the radio network coverage from 90% to 98% of the population in the Lagos region.

Additionality and Impact

The project is aligned with the Cotonou (ACP-EC) partnership agreement from 2000 and addresses the specific market failure leading to under-investment in broadband network infrastructures in lower profitability areas, mainly due to low average revenue per user levels, combined, in the case of hard to reach areas, with high unit costs for the infrastructure. The project will not have relevant negative environmental and social impacts. On the other hand, the roll-out of the infrastructure will support the country's transition to a digital economy, resulting in significant positive social impacts through increased 4G coverage (fourth generation of mobile phone technology). Mobile communication technologies have been shown to enable positive environmental impacts related to climate change mitigation and adaptation in other sectors of the economy. The promoter and its main supplier for the project are reputable companies with high capacity,which ensures high quality and cyber-secure digital services. The sizeable hard currency loan provided by the European Investment Bank with a relatively long maturity and grace period will enable the promoter to secure equipment internationally in order to implement the Project in line with best practices.

Ziele

The aim is to address the increased growth expected in mobile data applications, as well as the necessary upgrades in terms of capacity and functionality of the core network and business support systems. Thanks to the project, mobile broadband services will reach most of the remaining areas in the region that do not yet have access to the service.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 100 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 200 million

Umweltaspekte

If it were located within the EU, the project would not require a mandatory Environmental Impact Assessment (EIA), as it does not fall under Annex I or II of the EIA Directive 2014/52/EU amending the Directive 2011/92/EU. Typically, the rollout of mobile telecommunication networks have limited environmental and social negative effects. Moreover, in this case the promoter will rely on existing mobile sites in which it will install new equipment. Full environmental and social details will be assessed during appraisal.

Auftragsvergabe

The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

Projektstatus

Unterzeichnet - 15/11/2021

Milestone
In Prüfung
Genehmigt
Unterzeichnet
17 Juni 2021
15 November 2021

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Nigeria Telekommunikation