Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20200916
Veröffentlichungsdatum: 11 Juni 2021

Projektträger – zwischengeschaltetes Finanzinstitut

ENEL GREEN POWER ESPANA SL

Ort

Beschreibung

The operation is a framework loan to finance the deployment across Spain of Endesa's renewable energy generation assets over the 2021-2023 period (solar photovoltaic (PV), wind onshore and potentially batteries).

Additionality and Impact

The project increases renewable energy generation capacity in Spain and contributes to national and EU 2030 climate objectives. The financing of this project also contributes to Bank's lending priority objectives on Renewable Energy as well as on climate action, environmental sustainability and on economic and social cohesion. The project produces electricity from low carbon sources (solar PV and on-shore wind), addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation). As the schemes are expected to rely (at least partially) on revenues from the market (the wholesale market and/or unsubsidized commercial Power Purchase Agreements), and potentially revenues from market-based public support (Contracts for Difference), in a sector characterised by incomplete markets (limited forward/hedging, lack of scarcity pricing and lack of locational pricing), the project improves market efficiency and competition. Thus the operation is expected to yield good quality and results, thanks to avoided GHG emissions and fair employment creation. The EIB's contribution will be most visible on the financial contribution side by accelerating the fundraising process and crowding in other financiers. The schemes are expected to be located mostly in EIB Cohesion Priority regions.

Ziele

The operation is proposed to be structured as a framework loan aimed at financing part of Endesa's ambitious renewable energy investment programme in Spain throughout the period 2021-2023. The pipeline of plants to be included under this operation will be a mixture of wind and solar-photovoltaic power plants.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 700 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 1400 million

Umweltaspekte

Endesa will be requested to comply with applicable national and EU legislation.

Auftragsvergabe

Endesa will be requested to comply with applicable national and EU legislation.

Projektstatus

Unterzeichnet - 11/11/2021

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Spanien Energie