Veröffentlichungsdatum: 26 November 2021
Projektträger – zwischengeschaltetes Finanzinstitut
ADIF ALTA VELOCIDADOrt
Beschreibung
The project consists of an extension of capacity of the Madrid Chamartin station. It is part of the extension of the Madrid Railway Node and is complementary to the capacity expansion of the Madrid Atocha station and other measures with aim of operating them as one hub with two terminals. The project will constitute the first allocation of Framework Loan 2020-0034. The project is located on the Core Trans-European Transport Network (TEN-T) Atlantic and Mediterranean Corridors.
Additionality and Impact
The project will increase the capacity of the Madrid railway node and by this means allow the growth of traffic on the Spanish railway network. This will result in time savings, vehicle operating cost savings, transport safety benefits, and environmental benefits in terms of reduction of greenhouse gases and pollutants. The project is 100% eligible under Climate Action.
The EIB financial contribution will entail a long tenor, commensurate with the economic life of the assets financed, and a long grace and availability periods, in line with the project´s implementation period. The EIB loan will complement the Next Generation EU funds that the project will receive, given its relevant contribution to the economic recovery following the COVID-19 pandemic. The flexibility of drawdowns of EIB loan will allow optimising the blending of EIB financing with EU funds over time, contributing to project acceleration.
Ziele
The project will increase capacity of and reduce congestion in the Madrid railway node, and thereby allow the expected traffic growth in the high-speed lines converging in Madrid, as well as in the Madrid suburban railway lines.
Sektor(en)
- Verkehr - Verkehr und Lagerei
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 170 million
Gesamtkosten (voraussichtlicher Betrag)
EUR 360 million
Umweltaspekte
Some of the schemes included in the project fall under Annex I or II of the Environmental Impact Assessment Directive 2011/92/EU (as amended by Directive 2014/52/EU). The EIA, the screening decisions and the need for assessment according to the Habitats Directive 92/43/EEC will be analysed during the appraisal.
Auftragsvergabe
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.
Projektstatus
Genehmigt - 17/11/2021