Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20210695
    Veröffentlichungsdatum: 29 Juni 2022

    Projektträger – zwischengeschaltetes Finanzinstitut

    OESTERREICHISCHE BUNDESFORSTE AG

    Ort

    Beschreibung

    Construction and operation of four wind turbines with a total capacity of 16.78 MW in the state of Styria, Austria. The project is an extension to an existing wind farm (Pretul).

    Ziele

    The project contributes to the national renewable energy targets as set out in the final National Climate and Energy Plan, published in December 2019. Austria aims to provide 100% of electricity consumption from renewable energy sources by 2030. The financing of this project also contributes to Bank's lending priority objectives on energy (Renewable Energy) as well as on climate action (transversal).

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 3 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 21 million

    Umweltaspekte

    The environmental and social risks associated with such exposed locations can be higher than for other onshore wind farms.

    Auftragsvergabe

    The EC has exempted all contracts, which are being awarded to implement electricity generation projects in Austria from the scope of the Utilities Directive 2004/17/EC (EC decision 2008/585/EG). No public procurement is therefore required.

    Projektstatus

    Unterzeichnet - 12/07/2022

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Österreich Energie