Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20210751
Veröffentlichungsdatum: 23 November 2022

Projektträger – zwischengeschaltetes Finanzinstitut

ELETROPAULO METROPOLITANA ELETRICIDADE DE SAO PAULO SA

Ort

Beschreibung

This investment is an allocation of funds under the Enel Energy & Renewable framework loan, consisting of electricity distribution investments in Brazil. These aim to extend and modernise the network, add new renewable energy capacity to the network, reduce losses and improve quality and safety of supply.

Ziele

The project consists of the financing of the modernisation and extension of the Promoter's electricity distribution networks in the São Paulo region and of the installation of new remote control systems and protections of the grid, with the aim of increasing the its reliability, resilience and reducing the level of losses, leading to better quality and safety of energy supply. A portion of the investment will also enable the connection to additional renewable generation units.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

USD 200 million (EUR 188 million)

Gesamtkosten (voraussichtlicher Betrag)

USD 422 million (EUR 397 million)

Umweltaspekte

The Bank reviewed the environmental and social capacity of the Promoter, including its organisation, processes and procedures, and deemed them to be good. Based on the information available, the programme is expected to have minor negative residual impacts and thus is acceptable for Bank financing from an environmental and social perspective. The Promoter undertakes to implement the project in accordance with the EIB's Environmental and Social Standards and in compliance with the national environmental legislation. Furthermore the programme does not entail components with significant, negative environmental and/or social impacts or requiring physical resettlement and/or impact on indigenous people in accordance with undertakings committed to under the Framework Loan 2020-0823. The Promoter undertakes not to allocate the Bank's funds to any components of the programme that require an environmental and social management plan (ESMP) before this has been sent for review to the satisfaction of the Bank.

Auftragsvergabe

The concession to the Promoter was awarded in a transparent and internationally competitive manner, the programme is not subject to public procurement rules. The procurement procedures followed by the Promoter are suitable for the project and satisfactory to the EIB.

Projektstatus

Genehmigt - 21/12/2022

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Brasilien Energie