Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20220706
Veröffentlichungsdatum: 19 März 2025

Projektträger – zwischengeschaltetes Finanzinstitut

LARIO RETI HOLDING SPA

Ort

Beschreibung

The project will finance the promoter's investments in water infrastructure (e.g. water and wastewater treatment plants, networks and pumping stations) during the period 2024 - 2028.

Ziele

The aim is to continue support the promoter's investments in the Province of Lecco (Lombardy Region).

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 20 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 49 million

Umweltaspekte

The capacity of the Promoter with regards to Environmental and social aspects will be assessed during appraisal. The above-mentioned facilities are likely to fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU amended by the Directive 2014/52/EU, Strategic Environmental Assessment (SEA) Directive (2001/42/EC), Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC). The project is expected to bring substantial public health and environmental benefits from improved access to safe and resilient water services, reduced greenhouse gas emissions from reduced water losses, a more rational use of water resources and protection of local groundwater. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation, and sustainable use and protection of water and marine resources.

Auftragsvergabe

The EIB requires the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the applicable EU procurement legislation Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Italien Wasser, Abwasser