Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20220950
Veröffentlichungsdatum: 6 September 2023

Projektträger – zwischengeschaltetes Finanzinstitut

MINISTERE DU CADRE DE VIE ET DES TRANSPORTS CHARGE DU DEVELOPPEMENT DURABLE - REPUBLIQUE DU BENIN

Ort

Beschreibung

The project will finance a rainwater drainage infrastructure targeting several secondary cities in Benin, covering 3 cities in the North of the country, Natitingou, Djougou and Kandi.

Additionality and Impact

The project will support the Government of Benin to cope with recurrent floods in selected secondary cities through the construction and rehabilitation of rainwater drainage infrastructure (primary and secondary canals, gutters, etc). As such, the project will contribute to the adaptation of the beneficiary cities to the effects of climate change.

The operation is aligned with Benin's Government Action Plan and with EIB and EU policy objectives, including with the Global Gateway investment package for climate resilience. The cities which will benefit from EIB financing are located in the north of the country. The development of basic infrastructure in these cities will contribute to maintaining peace and security, which is in line with the EU's Multiannual Indicative Programme 2021-2027 for Benin. The EIB loan will provide favourable financing terms and conditions including long availability and grace periods. The project will comply with with the Bank's high standards. 

The operation will contribute to the achievement of the Sustainable Development Goals SDG11 - Sustainable Cities and Communities and SDG13 - Climate Action. It will also indirectly support SDG 1 - No poverty, SDG 3 - Good Health and 6 - Clean water and sanitation.

Ziele

The aim is to extend and rehabilitate the primary and secondary rainwater drainage systems, as well as related roads of the concerned cities. The project will significantly decrease flooding, as well as stagnating water, with a positive impact on human and economic development. It will considerably contribute to improve the living conditions of the population and to climate change adaptation.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 70 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 342 million

Umweltaspekte

The EIB will ensure that the project and the promoter's procedures for impact assessment and environmental monitoring comply with the applicable national environmental legislation and the EIB's environmental and social principles.

Auftragsvergabe

Implementation of the project will be done in accordance with the EIB's Guide to Procurement.

Projektstatus

Unterzeichnet - 29/12/2023

Milestone
In Prüfung
Genehmigt
Unterzeichnet
18 Oktober 2023
29 Dezember 2023

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Benin Wasser, Abwasser