    Referenz: 20230188
    Veröffentlichungsdatum: 14 Juni 2023

    Projektträger – zwischengeschaltetes Finanzinstitut

    NOVO ENERGY PRODUCTION AB

    Ort

    Beschreibung

    The project concerns the construction and operation of a production facility for advanced lithium-ion batteries for electric vehicles to be located in Gothenburg. The site will have a yearly production capacity of 35 million cells or up to 17.5 GWh of battery capacity being produced from one downstream block and associated facilities integrated into one building.

    Ziele

    The aim is to make a substantial contribution to the development of a competitive EU-based battery industry while enabling the development of the European electric vehicles (EV) industry. Additionally, the project will support the transition to e-mobility, by meeting the growing demand for EV batteries in Europe with cutting-edge battery cell.

    Sektor(en)

    • Industrie - Verarbeitendes Gewerbe/Herstellung von Waren

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    USD 500 million (EUR 458 million)

    Gesamtkosten (voraussichtlicher Betrag)

    USD 2233 million (EUR 2047 million)

    Umweltaspekte

    As an integrated industrial plant, the project falls under Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending Directive 2011/92/EU requiring a full EIA process. An EIA Report has been produced, presented for public consultation and the full environmental permit is expected to be issued by the Competent Authority in the Summer of 2023. During appraisal the EIB will review the EIA process and documents, as well as compliance with EU Directives for the protection of Habitats and Birds, respectively.

    Auftragsvergabe

    The promoter is a private entity not operating in the utilities sector, thereby not obligated to follow public procurement procedures.

    Projektstatus

    Genehmigt - 21/03/2024

    Milestone
    In Prüfung
    Genehmigt
    21 März 2024

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Schweden Industrie