Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20230281
    Veröffentlichungsdatum: 12 Oktober 2023

    Projektträger – zwischengeschaltetes Finanzinstitut

    TRENITALIA SPA

    Ort

    Beschreibung

    The project will finance the purchase of 102 new electric multiple units (EMUs), for regional rail services in Campania and Lazio, as well equipping these vehicles with European Rail Traffic Management System (ERTMS).

    Ziele

    The aim is to replace life expired units which will be taken out of service and scrapped. The rolling stock will be in conformity with the applicable Technical Specifications for Interoperability (TSI). The services will be operated under Public Service Contracts (PSCs) with the regions. The PSCs for Campania and Lazio were directly awarded to Trenitalia for 2019-2033 and 2018-2032 respectively.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 500 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1346 million

    Umweltaspekte

    The project will have a positive environmental impact by helping the railways to maintain modal share in key sections of the passenger market that are most appropriately met by rail. The project does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (amended by Directive 2014/52/EU). Any need for an EIA and/or Habitats Directive regarding the related facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. Any scrapping process of the replaced stock will also be checked during appraisal. The rolling stock will comply with the applicable Technical Specifications for Interoperability (TSI), including the Regulation 2014/1300 on the technical specifications for interoperability relating to accessibility of the Union's rail system for persons with disabilities and persons with reduced mobility (PMR).

    Auftragsvergabe

    The promoter has to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU or Directive 2004/17/EC, where applicable, as well as Directive 92/13/EEC, as interpreted by the EU Court of Justice (OJEU), with publication of tender notices in the OJEU, as and where required. The contracts for the supply of rolling stock have already been placed. The call for competition and award notices were published in the OJEU (2015/S 147-272253, 2016/S 152-276413 and 2021/S 181-471957).

    Projektstatus

    Unterzeichnet - 7/12/2023

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    16 November 2023
    7 Dezember 2023

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Verkehr