Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20230602
Veröffentlichungsdatum: 13 Dezember 2023

Projektträger – zwischengeschaltetes Finanzinstitut

MVM ENERGETIKA ZRT

Ort

Beschreibung

The operation concerns the purchase of Green Bonds to finance MVM's investments in renewable energy, electricity networks and clean transportation included in the company's green bond framework.

Ziele

The proposed operation consists of the purchase of one or several senior green bonds, the proceeds of which will finance new or existing investments in the following sectors in Hungary, as set out in the Promoter's green financing framework: renewable energy electricity generation, production of green hydrogen, transmission or distribution of electricity, storage of electricity or hydrogen. By the end of the allocation period, the issuer will have allocated a portion of the funds to an agreed amount of new eligible investments. The underlying projects are not known at this stage.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 350 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 700 million

Umweltaspekte

The schemes underlying the operation will fall under Annex I or II of the EIA-Directive 2011/92/EU, requiring either an EIA including public consultation, or screening by the national competent authority on the basis of Annex III of the same Directive to determine the need for an environmental impact assessment (EIA). Where and if applicable, the requirements of EU legislation, mainly the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC, will be verified during appraisal.

Auftragsvergabe

The Bank will require the promoter to ensure that contracts for implementation of the underlying eligible project will be tendered in accordance with the applicable EU procurement legislation, i.e. Directives 2014/23/EU, 2014/24/EU or 2014/25/EU as well a s Directive 92/13/EEC or Directive 89/665/EEC as applicable and interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Genehmigt - 19/12/2023

Milestone
In Prüfung
Genehmigt
19 Dezember 2023

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Ungarn Energie