Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20230680
Veröffentlichungsdatum: 27 Februar 2024

Projektträger – zwischengeschaltetes Finanzinstitut

STADT NUERNBERG

Ort

Beschreibung

The project will finance the renovation and extension of the New Grammar School Nuremberg (NGN), a secondary school for 1025 students in the City of Nuremberg. It will be implemented by WBG Kommunal GmbH, a public housing construction company of the City of Nuremberg.

Additionality and Impact

The proposed operation supports the renovation and extension of a public secondary school in Germany. The project addresses a market failure with regard to the provision of public education, which creates positive externalities for the economy and society without generating financial returns to the investor, justifying public intervention.

By being able to offer stable and long-term funding at competitive rates, a financial advantage is generated through the EIB's intervention which is transferred partially to the final beneficiary, for example in the form of reduced interest rate payable.

Ziele

The renovated and extended school building will be designed to enable the implementation of new competence-centred pedagogical concepts and will include a theatre and art and craft rooms, with the aim to foster pupils' acquisition of a wide range of skills. The school is planned as a low-energy building with an energy efficiency above the regulatory requirements. The installation of photovoltaic systems is foreseen on all possible roof surfaces.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 50 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 110 million

Umweltaspekte

Directive 2011/92/EU amended by 2014/52/EU on Environmental Impact Assessment (EIA) does not specifically cover educational activities, leaving it at the discretion of the responsible competent authorities to request an EIA on the basis of the location and scale of the works concerned. However, educational facilities may fall under Annex II of the Directive with respect to Urban Development. The Bank's services will verify during appraisal whether an EIA is required by the competent authority. The public buildings will be required to at least meet the energy efficiency targets as defined in Directive 2010/31/EU on the energy performance of buildings and Directive 2012/27/EU on energy efficiency.

Auftragsvergabe

In accordance with the Bank's policy to ensure that the loan complies with the EU acquis, in particular in the fields of public procurement, the Bank will require such intermediary institution to take all requisite measures to ensure that the procurement procedures carried out by the final beneficiary for the project that the Bank finances will comply with the relevant EU legislation and the applicable national legislation, provided that it is in conformity with EU rules.

Projektstatus

Unterzeichnet - 25/06/2024

Milestone
In Prüfung
Genehmigt
Unterzeichnet
4 Juni 2024
25 Juni 2024

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Deutschland Bildung