Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20230900
Veröffentlichungsdatum: 4 September 2024

Projektträger – zwischengeschaltetes Finanzinstitut

IBERDROLA SA

Ort

Beschreibung

Financing of the Caparacena (330MWp) and Tagus (330MWp) solar photovoltaic projects and the El Escudo on-shore wind farm (151MW). Second allocation under the framework loan (FL) IBERDROLA REPOWEREU FRAMEWORK LOAN (2022-0896).

Ziele

The aim is to contribute to achieve the EU-wide target of reaching 42.5% of energy from renewable sources in gross final energy consumption by 2030, as set out in the current EU Renewable Energy (Directive EU/2018/2001 revised by EU/2023/2413). It also contributes towards the renewable energy targets as laid out in the Spain's National Energy and Climate Plan (NECP). The operation is in line with both the EIB's cohesion objectives and with the lending priority related to renewable energy and climate action.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 409 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 712 million

Umweltaspekte

The schemes and most of their ancillary infrastructure fall under Annex II of the EIA Directive 2011/92/EU as amended by Directive 2014/52/EU. All the schemes underwent an environmental impact assessment (EIA) process including public consultation. The plants and associated infrastructure obtained their environmental permits (Declaración de Impacto Ambiental - DIA) between May 2021 and January 2023.

Auftragsvergabe

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation, then the Bank would require the promoter to apply those rules.

Projektstatus

In Prüfung

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Spanien Energie