Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20230938
    Veröffentlichungsdatum: 17 Juni 2024

    Projektträger – zwischengeschaltetes Finanzinstitut

    ENEL COLOMBIA SA ESP

    Ort

    Beschreibung

    The project will finance investments in sustainable electricity distribution and generation from renewable energy sources.

    Ziele

    The aim is to develop sustainable energy infrastructure supporting Colombia's decarbonisation pathways. As such, the project contributes to national climate mitigation objectives, as well as to security and reliability of energy supply, thus enhancing economic growth and quality of life. In line with the UN 2030 Agenda, the project addresses several strategic development goals (SDGs), in particular SDG 7 (affordable and clean energy) and SDG 13 (climate action), while mainstreaming job creation. The project therefore supports and contributes to people, planet, prosperity and partnerships dimensions of the European Consensus on Development.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    USD 300 million (EUR 281 million)

    Gesamtkosten (voraussichtlicher Betrag)

    USD 650 million (EUR 608 million)

    Umweltaspekte

    The operation intends to generate environmental benefits by supporting sustainable energy infrastructure that help to mitigate climate change. Some of the projects and in particular the renewable energy projects to be financed by this operation are expected to require an Environmental Impact and Social Assessment (ESIA) under the relevant national legislation. However, if located within the EU, the renewable energy generation plants could fall under the Annex II of the Environmental Impact Assessment (EIA) Directive 2014/52/EU (amending Directive 2011/92/EU), requiring the competent authorities to determine whether an EIA is required. With regards to the electricity distribution allocations, the majority of the schemes currently proposed comprise of medium and low voltage assets. Therefore, if located in the EU, they would fall neither under Annex I nor under Annex II of the EIA Directive. High Voltage lines and/or substations may fall under Annex I or II of the EIA Directive. Subject to their characteristics and cumulative impact, an EIA may be required. Nonetheless, the Bank will assess the capacity and procedures of the Promoter to ensure the projects' compliance with national environmental, social and biodiversity regulations, as well as with the EIB's environmental and social standards and the principles of relevant EU Directives (i.e. Habitats Directive 92/43/EEC and Birds Directive 2009/147/EC).

    Auftragsvergabe

    The promoter has to ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement, specially discarding any type of local content or local preference requirement at sub-project (allocation) level.

    Projektstatus

    Unterzeichnet - 10/10/2024

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    26 Juni 2024
    10 Oktober 2024

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Kolumbien Energie