Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20240063
Veröffentlichungsdatum: 2 Mai 2024

Projektträger – zwischengeschaltetes Finanzinstitut

CANAL DE ISABEL II SA MP

Ort

Beschreibung

The project will finance the promoter's water and wastewater investment programme aimed at improving the quality and resilience the services provided in the region of Madrid.

Ziele

The aim is to upkeep resilient, efficient and sustainable water services while ensuring compliance with the environmental requirements set by the national and the EU legislation.

Sektor(en)

  • Wasser, Abwasser - Wasserversorgung; Abwasser- und Abfallentsorgung und Beseitigung von Umweltverschmutzungen

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 430 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 992 million

Umweltaspekte

The investment is geared toward upgrading water and wastewater infrastructure (water and wastewater treatment plants, networks) bringing positive environmental impacts. The promoter will be required to comply with the EU Water Framework Directive (2000/60/EC), Urban Waste Water Treatment Directive (91/271/EEC), and EU and national environmental legislation (notably under the environmental impact assessment (EIA) Directive 2011/92/EU (amended by the Directive 2014/52/EU), Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC). This investment is expected to improve the resilience of the water supply system and to preserve water resources in a water stress area. It will, therefore, increase the quality of life in the project area. Social negative impacts are only temporary (e.g. occupation of public and private space, safety hazards during construction, traffic, noise) and will be addressed as part of the planning for the implementation of each scheme. The promoter has demonstrated sound practices with respect to environmental, health and safety management and will be required to ensure compliance with the applicable legislation regarding social matters. The project is expected to contribute to climate action and environmental sustainability (CA&ES) objectives, in particular to climate adaptation, pollution prevention and control, sustainable use and protection of water and marine resources, Where and if applicable, the requirements of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU, Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC and the requirements of social standards will be verified during appraisal

Auftragsvergabe

The promoter has to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/23/EU and/or 2014/24/EU and/or 2014/25/EU, where applicable, as well as Directive 92/13/EEC and Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Genehmigt - 7/11/2024

Milestone
In Prüfung
Genehmigt
7 November 2024

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Spanien Wasser, Abwasser