Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
Referenz: 20240409
Veröffentlichungsdatum: 24 Oktober 2024

Projektträger – zwischengeschaltetes Finanzinstitut

SACHSENENERGIE AG

Ort

Beschreibung

The project concerns investments in the electricity distribution grid in Saxony, Germany, for the period 2024-2029.

Additionality and Impact

The Project concerns standard electricity network investments in a regulated natural monopoly.

The Promoter's CAPEX plan includes investments in electricity distribution. The Project will contribute to maintaining or increasing security of supply in the context of growing electricity demand, from heating and mobility in particular, and growing integration of electricity production from RES.

The Project is expected to contribute to Bank's lending priority objectives on Climate Action and Environmental Sustainability and it aligns with the REPowerEU objectives. The financing of the Project will contribute to the Bank's ELP themes on Securing the Enabling Infrastructure (energy networks).

The operation addresses a number of market failures, including increasing security of energy supply, and the integration of low-carbon generation, which reduces carbon emissions and air pollution, with positive climate and health externalities.

The project is expected to deliver an excellent rated economic rate of return and excellent rated broader social benefits. The promoter is experienced in works of this nature and has a sound project management system in place.

In financial terms, the EIB loan is expected to allow the Borrower to diversify its funding sources (with first time financing from EIB) at attractive financial conditions, with a long term (25 years) and grace period (3 years), reflecting the average economic life of the assets and the time for project's construction/implementation. The EIB loan also allows a high flexibility in use of the line, with limited commitment fees over a 4 year availability period. In non-financial terms, the granting of the EIB loan is considered to have a positive signalling effect.

Ziele

The project caters for demand growth, the connection of network users, the integration of renewables, and the improvement of the quality of service and the efficiency of operations.

Sektor(en)

Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

EUR 400 million

Gesamtkosten (voraussichtlicher Betrag)

EUR 732 million

Umweltaspekte

The project includes components that may fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected for some schemes relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC).

Auftragsvergabe

The EIB will require the promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Projektstatus

Unterzeichnet - 25/03/2025

Milestone
In Prüfung
Genehmigt
Unterzeichnet
6 Januar 2025
25 März 2025

Haftungsausschluss

Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

Tags

Deutschland Energie