Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

Signature(s)

Amount
€ 650,000,000
Countries
Sector(s)
Türkiye : € 650,000,000
Transport : € 650,000,000
Signature date(s)
20/09/2004 : € 200,000,000
9/12/2005 : € 450,000,000
Link to source
Data sheet

Summary sheet

Release date
3 May 2004
Status
Reference
Signed | 20/09/2004
19990272
Project name
Promoter - financial intermediary
Bosphorus Tunnel
Ministry of Transport and Communication, General Directorate of Railways, Harbours and Airports
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 600 million.
Between EUR 2 and 3 billion.
Location
Sector(s)
Description
Objectives

Construction of the first intercontinental railway between Europe and Asia crossing the Bosphorus, as well as a major transport connection for the metropolitan city of Istanbul. The connection is part of Pan-European transport corridor IV.

The project is expected to provide significant economic benefits through major travel time-savings for interurban passengers and freight and, particularly, for the users of public transport within the city of Istanbul. Furthermore, it will help avoid layovers and transhipment costs. The investment will equally contribute to the environment by reducing the need for road-based public transport, for passenger ferries, and possibly for travel by private car, thus lowering the level of congestion, of traffic accidents and of environmental externalities - principally air and noise pollution, and vibrations.

The project sets a milestone by providing the first intercontinental railway link between Europe and Asia crossing the Bosphorus Straits, thus bridging an important gap in the Pan-European transport network. Serving also as a major mass transport connection for the metropolitan city of Istanbul, which is divided by the Straits into Western and Eastern sides, the project promises significant economic benefits.

Environmental aspects
Procurement

Though this project was agreed for inclusion in the Turkish Development Plan at a time (1993) when a full EIA was not required by national law, in practice, considerable environmental information has been collected and approvals have been obtained from the relevant Turkish authorities, covering in substance the requirements of an Environmental Impact Assessment (EIA) according to good international practice.

The process and content of the EIA will be reviewed by the EIB during its appraisal with a view to confirm that the requirements of the EC EIA Directive have been met, according to EIB policy for projects of this type outside the EU. In particular it will be verified that a comprehensive and systematic study will encompass the screening of alternatives and an impact assessment along with proposed mitigation/compensation measures. The appropriateness of the public consultation process as well as the arrangements for environmental management during project implementation and operation will also be reviewed.

The project is foreseen to be financed by two main sources of funds, EIB and Japan Bank for International Cooperation (JBIC). Accordingly, and in-line with the Bank's guidelines for procurement it is envisaged that there will be parallel financing, with EIB and JBIC. During appraisal, procurement procedures for all past and future contracts will be checked for consistency with the Bank's guidelines.

Link to source
Summary sheet

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

News & Stories

Other links
Data sheet
Summary sheet

Photogallery

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications